LIST OF MAJOR WORKS UNDER PROGRESS

  • EHV INSTALLATIONS

    No.

    NAME OF THE CLIENT

    JOB DESCRIPTION

    1 Mahalakshmi Vidyut Pvt. Ltd. Turnkey execution of 220/33 kV, 25 MVA transformer S/s.& transmission line for Evacuation of power from 2 5 MW Small Hydro Project at Konal, Dist. Sindhudurga.
    2 Standard Industries Ltd. Design, manufacture, supply, erection, testing & commissioning of 100/11 kV, 2 X 25 MVA Transformer Substation and 7 nos. of bays with 132 kV transmission line at Standard Industries.
    3 Regen Powertech Pvt. Ltd. Establishment of 220/33KV, 2 x 100 MVA Substation at Hiwarwadi / Dhokalwadi Village, Taluka Khatav, Satara District, Maharashtra.

     

  • GOVERNMENT & SEMI-GOVERNMENT SECTOR EHV INSTALLATIONS

    No.

    NAME OF THE CLIENT

    JOB DESCRIPTION

    1 MSETCL Pune (Daund Sugars) Design, Supply, Erection , Testing & Commissioning of 132/22 KV, 25 MVA Power Transformer,4 X 22 kV bays with associated Civil work and SCADA system Co Generation Plant.
    2 NTPC Ltd. 132 kV Switchyard for start-up power for 2000MW NTPC, Mouda
    3 MSETCL Pune (Malinagar) Augmentation of 1X50 MVA, 132/33 kV Transformer &1X100 MVA 220 /132 kV ICT at 220 kV Malinagar Substation.
    4 MSETCL Pune (Jeur) 132 kV bays, 220 kV, 50 MVA Transformer bay at 220 kV Jeur Substation.
    5 MSETCL Pune (Karmala) Establishment of 132/33 kV Karmala S/stn. (Phase I), 132/33 kV, 2X 50MVA Transformer Karmala S/stn. (Phase - II), LILO on existing 132 kV Jeur- Karjat for 132/33 kV Karmala S/stn. (9 KM) And stringing of second circuit (Hot line) of 132 kV Karmala S/stn. Dist. Solapur (turnkey contract) (Rout length: 46 Kms)

     

  • CO-GENERATION PROJECTS

    No.

    NAME OF THE CLIENT

    JOB DESCRIPTION

    1 Rochem Seperation System India Pvt. Ltd. Turnkey execution of 132/22 kV, 12.5 MVA transformer S/s.& 22 kv underground cable laying for Evacuation of power from 10 MW bagasse based power plant.
    2 Shivratna Udyog & Allied Industries Ltd. (Vijay Sugars Unit), Karkamb, Dist. Solapur. Design, Supply, Erection, Testing & Commissioning of 220/33 kV Switchyard and DC line for Evacuation of power from 12.5 MW cogeneration plant at village Karkamb, Dist. Solapur.
    3 Ambalika Sugars Pvt. Ltd., Baradgaon Budruk, Tal. Karjat, Dist. Ahmednagar. Design, Supply, Erection, Testing & Commissioning of 11/132 kV Generating Substation for 13 MW Co-generation Project for M/s. Jagdamba Sugars ltd., Dist. Ahmednagar.
    4 Technocraft Industries (India Pvt. Ltd.) Design, Supply, Erection , Testing & Commissioning of 15 MW 132/11 KV Substation Co Generation Plant and 132 kV Transmission Line at Dhanivali, Murbad, Dist. Thane on Turn-Key basis.
    5 Loknete Sahakari Sakhar Karkhana, Solapur Electrical Installation, Erection of 8 MW , 11/33kV Switchyard for Co-generation Project of Loknete,

     

  • INDUSTRIAL INSTALLATIONS

No.

NAME OF THE CLIENT

JOB DESCRIPTION

1 M/s. TATA Engineering & Locomotive Co. Ltd., Pimpri, Pune. ARC Contract- electrical installation work at TML, Chinchwad works for the period 01.11.2007 to 31.10.2010
2 M/s. TATA Engineering & Locomotive Co. Ltd., Pimpri, Pune. ARC Contract- electrical installation work at TML, Chinchwad works for the period 01.01.2011 to 31.12.2011
3 Thermax Babcock and Wilcox Energy Solutions Pvt. Ltd. Design, Supply, Erection, Testing and commissioning of 33 kV Substation and Transmission line work at M/s. Thermax Babcock and Wilcox Energy Solutions Pvt. Ltd, MIDC khandala, Kesurdi, Satara.
4 Helvoet Pharma India Operations Pvt. Ltd. Design, Supply, Erection, Testing and commissioning of 33 kV Substation and Transmission line work at M/s. Thermax Babcock and Wilcox Energy Solutions Pvt. Ltd, MIDC khandala, Kesurdi, Satara.

 

 